See how many design hours you're short each month.
Count your design work and your team's hours, and see where you need extra support, with a number you can back up. Free, no email needed.
Work out your number
Step 1: Count your monthly design needs
Pick a recent typical month and enter everything you made, plus any briefs that got pushed to a later month.
| What you're producing | New designs a month | Adaptations a month (resizes, versions) | Total hours |
|---|---|---|---|
Static social post 1 post, 1 size | × 1h | × 0.5h | = 0h |
Social carousel 1 carousel, up to 5 slides | × 3.5h | × 1.5h | = 0h |
Paid ad 1 static ad, 1 size | × 1h | × 0.5h | = 0h |
Email design (EDM) 1 email, up to 6 sections | × 4h | × 2h | = 0h |
Presentation Per 10 slides | × 7h | × 3.5h | = 0h |
Campaign artwork (main design) 1 main design | × 5h | × 1h | = 0h |
Flyer or poster 1 single-sided layout | × 2.5h | × 1h | = 0h |
Brochure 1 four-page brochure | × 7.5h | × 3h | = 0h |
Document page (report, fact sheet, sales sheet, case study) Per page | × 1.5h | × 0.5h | = 0h |
Event signage or collateral 1 banner or simple sign | × 1h | × 0.5h | = 0h |
Website banner or graphic 1 graphic, 1 size | × 1h | × 0.5h | = 0h |
Short video edit 15 to 30 seconds, your footage | × 5h | × 2h | = 0h |
| Total | Production hours: | = 0h |
An adaptation is a resize, a new version of an existing design, or a post in a set that reuses one design. The hours are typical for standard work, from reading the brief to checked final files, based on our own production.
Why we add a 20% buffer
On top of the hours above, the 20% covers extra rounds of changes, research for new kinds of work, switching between jobs, and extras asked for after approval.
Step 2: Count your available in-house hours
Enter the designers on your team, and we work out their available hours. Only count the hours your team can give this work, and if outside help already covers some of it, leave that out. Use Add a person for anyone else in-house who designs, with the hours they give you each month. No designers in-house? Leave this at zero.
| Who | How many | Real hours each | Total |
|---|---|---|---|
| Full-time designers | × 120 | = 0h | |
| Part-time designers | × days/wk |
÷ 5 × 120 | = 0h |
| Available monthly in-house hours | = 0h | ||
Where the 120 comes from
Step 3: See your number
Your workload changes through the year, so we also show a slow month at 0.8 times your need and a busy month at 1.5 times. Change either to match your year.
Know someone buried in design work? Send them this page.
Last updated November 2026. Full-time hours and leave follow the National Employment Standards (Fair Work Act 2009).
Your design hours summary
Email me my result
Cover your gap with a design subscription.
Grow into a design subscription.
We cover the gap when it comes up, so your team stays on track. Get your team of senior designers on a monthly plan. No lock-in on monthly plans.
We cover your steady gap and deliver on time, on brand. Get your team of senior designers on a monthly plan. No lock-in on monthly plans.
A gap this size can swamp a team. We cover it and can start within days. Get your team of senior designers on a monthly plan, on time, on brand. No lock-in on monthly plans.
We cover the busy-month peaks, so your team isn't stretched. Get your team of senior designers on a monthly plan. No lock-in on monthly plans.
We build a custom team of several designers around your calendar, scoped to the work you'd hand over.
No gap today, but we're here when your team's ready to grow. Get your team of senior designers on a monthly plan, whenever the work picks up. No lock-in on monthly plans.
In 15 minutes with Stephen, our founder, we'll go through:
- The work you'd hand over
- The hours and team you'd need
- What it costs